Electrical First Fix Checklist: What to Plan Before Your Extension or Loft Conversion

Blog · Domestic Extensions & Conversions

Electrical First Fix Checklist: What to Plan Before Your Extension or Loft Conversion

7 July 2026 · 7 min read

Key Takeaways

  • First fix happens before plastering — cables, back boxes, and wiring routes are locked in at this stage
  • Loft conversions have specific requirements around mains-wired smoke alarms and extractor fan wiring
  • Electrical work on an extension must comply with Part P of the Building Regulations
  • A registered electrician can self-certify the work, avoiding a separate building control inspection

Once plastering starts on your extension or loft conversion, changing your mind about where a socket or light switch goes gets expensive fast. First fix is the stage where all of that gets decided — so it's worth planning properly before the electrician is even on site, not during.

What actually happens at first fix

First fix covers everything that needs to go in before the walls are closed up: cables run through joists and studwork, back boxes fitted for sockets and switches, and wiring routed for lighting, heating controls, alarms, and anything else electrical the room needs.

  • Cable runs through walls, floors, and ceilings
  • Back boxes for sockets, switches, and dimmers
  • Wiring for lighting circuits, including any feature or under-unit lighting
  • Heating control wiring, where relevant
  • Data, TV aerial, and smart home cabling — much cheaper to include now than retrofit later

Loft conversions have their own rules

Building regulations are specific about loft conversions: mains-wired smoke alarms are required, with defined locations, and any extractor fan (for an en-suite, for example) needs to be wired in at first fix — not bolted on afterwards. Power points and lighting also need agreeing before plasterboard goes up, since retrofitting later means cutting into a finished ceiling.

Why timing with your builder matters

The single biggest cause of extra cost on extension electrics is being brought in too late — after first fix should have already happened. Ideally we're involved as soon as first fix is being scheduled, working directly from your architect's drawings or discussing the layout with your builder, so nothing gets missed and nothing needs re-cutting.

Certification and building control

Electrical work on an extension has to comply with Part P of the Building Regulations. Using a registered electrician (through NICEIC, for example) means the work can be self-certified, which saves you arranging a separate building control inspection for the electrics specifically. At the end of the job you should receive an Electrical Installation Certificate, a Building Control notification certificate, and full test results — keep all three with your property paperwork.

Related Service

Domestic Extensions & Conversions

Electrical works for extensions, conversions, and renovations.

Domestic Extensions & Conversions in Milngavie →
View Service

Frequently Asked Questions

When should I bring an electrician in on the project?
As early as possible — ideally once first fix is being scheduled with your builder, so sockets, lighting, and circuits are positioned correctly the first time.
Do you work directly from architect drawings?
Yes, and we're comfortable coordinating on-site with the rest of your build team rather than working in isolation.
Is Building Standards certification included?
Yes, we certify the electrical work to the standard your local authority requires.
Can you wire outbuildings and garden rooms as part of the same job?
Yes, including outdoor supplies and garden offices alongside the main extension or conversion.